【DO!BOOK・ページリンク】
1-p1217-1252-vqc4000_en   21 / 36

BOOKをみる

10秒後にBOOKのページに移動します


1A 2A 3A 4A 5A 6A 7A 8A 9A 10A COM 1B 2B 3B 4B 5B 6B 7B 8B 9B 10B 1B 1A 2B 2A 3B 3A 4B 4A 5B 5A 6B 6A 7B 7A 8B 8A 9B 9A 10B 10A COM 1A 2A 3A 4A 5A 6A 7A 8A 9A 10A COM 1B 2B 3B 4B 5B 6B 7B 8B 9B 10B 1B 1A 2B 2A 3B 3A 4B 4A 5B 5A 6B 6A 7B 7A 8B 8A 9B 9A 10B 10A COM COM. SOL.B SOL.A SOL.B SOL.A SOL.B SOL.A SOL.B SOL.A SOL.B SOL.A SOL.B SOL.A SOL.B SOL.A SOL.B SOL.A SOL.B SOL.A SOL.B SOL.A T VQC4000 kit (Terminal block box kit) IP67 compliant . Applicable crimped terminal: 1.25-3S,1.25Y-3,1.25Y-3N,1.25Y-3.5 . Name plate: VVQ5000-N-T . Drip proof plug assembly (for G 3/4): AXT100-B06A . This kit has a small terminal block inside a junction box. The provision of a G 3/4 electrical entry allows connection of conduit fittings. Terminal Block Connection Proper tightening torque (N・m) 0.7 to 1.2 Step 3. How to replace the terminal block cover Securely tighten the screws to the torque shown in the table below, after confirming that the gasket is installed correctly. Step 1. How to remove terminal block cover Loosen the 4 mounting screws (M4) and remove the terminal block cover. Step 2. The diagram below shows the terminal block wiring. All stations are provided with double wiring regardless of the valves which are mounted. Connect each wire to the power supply side, according Mounting screw (M4) to the markings provided inside the terminal block. Terminal block cover Gasket Electrical entry 2 x G 3/4 M3 screw 6 mm Special Wiring Specifications (Option) Mixed single and double wiring are available as options. The maximum number of manifold stations is determined by the number of solenoids. Count one point for a single solenoid type and two points for a double solenoid type. The total number of solenoids (points) must not exceed 20. 1. How to order Indicate option symbol "-K" in the manifold part number and be sure to specify station positions for single or double wiring on the manifold specification sheet. 2. Wiring specifications Connector terminal numbers are connected from solenoid station 1 on the A side in the order indicated by the arrows without skipping any terminal numbers. 1A 1B Station 1 2A 2B Station 2 3A 3B Station 3 4A 4B Station 4 5A 5B Station 5 6A 6B Station 6 7A 7B Station 7 8A 8B Station 8 9A 9B Station 9 10A 10B Station 10 Terminal no. Electrical Wiring Specifications (Conforms to IP67) COM Standard wiring The internal wiring is double (connected to SOL. A and SOL. B) for all stations regardless of the type of valve or options. Mixed single and double wiring are available as options. Series VQC4000 1236